Removal And Installation
WARNING: This page is about a different variant/trim than selected.
- 1.
Drain the cooling system. REFER to Engine Cooling .
- 3.
Position a floor jack with a block of wood under the front of the oil pan.
NOTE:
Failure to position the wood block and floor jack as illustrated can result in damage to the oil pan.
- 4.
Remove the engine coolant degas bottle. REFER to Engine Cooling .
- 6.
Remove the A/C tube bracket bolts from the upper and lower RH shock tower.- 1.
To install, tighten to 15 Nm (133 lb-in).
- 2.
To install, tighten to 9 Nm (80 lb-in).
- 1.
- 7.
Remove the 4 nuts, 3 bolts and the engine mount.- To install, tighten the bolts to 90 Nm (66 lb-ft).
- To install, tighten the nuts to 63 Nm (46 lb-ft).
- 9.
Fill and bleed the cooling system. REFER to Engine Cooling .




