LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2021 >> Voyager LX, Gas >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Heating & Air Conditioning (Service Information) >> Distribution, Rear >> Motor, Blower, Rear >> Removal And Installation >> Installation

Removal And Installation: Installation

GC0177352Courtesy of CHRYSLER GROUP, LLC
  1. Position the rear blower motor (1) into the HVACR housing.
  2. Install the screws (3) that secure the rear blower motor to the HVACR housing.
  3. Connect the blower motor wire harness connector (2).
    GC0178220Courtesy of CHRYSLER GROUP, LLC
  4. Position the HVACR housing (3) into the vehicle.
  5. Install the HVACR housing to inner quarter panel bolts (2). Tighten the bolts securely.
  6. Install the rear ceiling distribution duct. Refer to DUCT, CEILING DISTRIBUTION, REMOVAL AND INSTALLATION .
  7. Install the rear floor distribution duct. Refer to DUCT, FLOOR DISTRIBUTION, REAR, REMOVAL AND INSTALLATION .
    GC0178152Courtesy of CHRYSLER GROUP, LLC
  8. Install the A/C line to body nut (1). Tighten the nut securely.
  9. Install the right rear wheelhouse splash shield. Refer to SHIELD, SPLASH, REAR WHEELHOUSE, REMOVAL AND INSTALLATION .
  10. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.