LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2021 >> Voyager LXi, Gas >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> General Servicing >> Heating & Air Conditioning (Service Information) >> Distribution, Front >> Duct, Floor Distribution >> Removal And Installation >> Ducts, Front Floor Distribution >> Installation

Ducts, Front Floor Distribution: Installation

GC0177172Courtesy of CHRYSLER GROUP, LLC
  1. Position the left or right front floor duct and engage the duct (1) to the front transfer duct.
  2. For right duct installation, install the duct-to-HVAC-housing screws (2). Tighten the screws securely.
    GC0177556Courtesy of CHRYSLER GROUP, LLC
  3. For left duct installation, install the retaining pins (2) to the left floor distribution duct (1).
  4. For the left duct installation, install the steering column opening cover. Refer to COVER, STEERING COLUMN OPENING, REMOVAL AND INSTALLATION .