Roof Opening Panel Operating Cable and Guide - Shade: Installation
NOTE:
The roof opening panel motor(s) must be initialized when repairs are carried out on any part of the roof opening panel system, including whenever:
- the roof opening sliding glass or power shade motor has been removed from the roof opening panel system.
- the roof opening panel glass has been removed from the roof opening panel system.
- the roof opening panel assembly has been removed from the vehicle.
- a new roof opening sliding glass or power shade motor has been installed.
- a new roof opening panel glass has been installed.
- a new roof opening panel assembly has been installed.
Refer to Roof Opening Panel Motor Initialization - Sliding Glass Panel and Refer to Roof Opening Panel Motor Initialization - Shade .
- 2.
Align each roof opening panel operating cable and guide so they are 50.8 mm (2 in) from the rear edge of the guide as shown in illustration.
- 3.NOTE: A new shade assembly is already pre-tensioned. If installing a new shade assembly or if the tension was not lost, skip this step.
If installing the original shade assembly and pre-tension was lost during removal, the pre-tension must be set as shown in illustration.
- 1.
Using an appropriate tool, push in the shade assembly shaft and turn clockwise 23 turns.
- 2.
Pull the shade assembly shaft outward to lock the tension in place.
- 1.
- 4.
Check for correct alignment of the front sliding glass panel and rear fixed glass panel. Refer to Roof Opening Panel Alignment - Front and Refer to Roof Opening Panel Alignment - Rear .

