Starter Motor - 3.5L Ti-VCT: Installation
- 1.
Position the starter motor and install the 2 stud bolts.
- Tighten to 48 Nm (35 lb-ft).
- 2.
Position the wiring harness and attach the wiring harness retainer to the starter motor stud bolt.
- 3.
Install the starter motor solenoid wire terminal and the nut.
- Tighten to 5 Nm (44 lb-in).
- 4.
Install the starter motor solenoid battery cable terminal and the nut.
- Tighten to 12 Nm (106 lb-in).
- 5.
Install the starter motor terminal cover.
- 6.
Position the transmission manual control lever and install the nut.
- Tighten to 18 Nm (159 lb-in).
- 7.
Position the transmission cable and connect the transmission shift cable rotating slide snap.
- 8.
Connect the transmission shift cable and adjustment lock to the transmission manual control lever.
- 9.
Install the ACL assembly. REFER to Intake Air Distribution and Filtering
.
- 10.
Connect the battery ground cable. REFER to Battery, Mounting and Cables
.